1Z0-597 SPARC T4-Based Server Installation Essentials

Posted by

Exam Number: 1Z0-597
Exam Title: SPARC T4-Based Server Installation Essentials
Associated Certification Paths

Passing this exam is required to earn these certifications. Select each certification title below to view full requirements.

SPARC T4-Based Server Installation Certified Implementation Specialist

Duration: 120 minutes
Number of Questions:  70
Passing Score: 60%
Validated Against:  No version for validation.
Format: Multiple Choice

Complete Recommended Training

Complete the training below to prepare for your exam (optional):

SPARC T4-Based Servers Implementation Specialist (available to partners only)

Additional Preparation and Information

A combination of Oracle training and hands-on experience (attained via labs and/or field experience) provides the best preparation for passing the exam.

Training Opportunities for Oracle Partners (available to partners only)

SPARC T4 Overview
Describe the target workloads for the SPARC T4 servers
Describe the SPARC T4 processor architecture
Describe the SPARC T4 server architecture
Explain the SPARC T4 cryptographic algorithms
Explain the SPARC T4 virtualization options (e.g., Oracle VM Server for SPARC)

Enterprise Installation Standards (EIS)
Describe the Enterprise Installation Service methodology
Setup and generate self-contained installation documentation
Create an installation configuration plan
Create a test procedures plan
Explain the hardware acclimatization process
Describe the cable labeling and routing process
Describe the electrical grounding requirements
Describe Oracle Solaris requirements
Determine boot disk layout and mirroring
Use Live Upgrade, Boot environment, and Image Packaging System

SPARC T4 Server Installation
Describe the benefits of electrostatic discharge prevention
Rackmount the server, cable, and install peripherals
Configure the service processor
Secure the service processor
Update firmware
Perform host power on and Power On Self Test (POST)
Verify and/or upgrade RAID controllers
Install Oracle Solaris
Test CPU and memory with Sun Validation Test Suite (SunVTS)
Setup and configure Auto Service Request (ASR)
Run Explorer and register products
Troubleshoot common installation issues

Oracle VM Server for SPARC
Verify patch and firmware levels
Install Logical Domains (LDoms) manager
Harden the control domain
Configure the control domain
Install and configure guest domains

SPARC T4 Server Maintenance and Diagnostics
Describe customer and field replaceable components
Verify system serial number
Replace the motherboard
Perform PCIe card and riser removal and installation
Perform disk, power supply, and fan removal and installation
Describe memory configuration guidelines
Describe disk backplane configuration rules
Describe server management tools
Collect system error and state information

QUESTION 1
To disable ILOM CLI session time-out, which command should be used?

A. Set /SP/cli timeout = n
B. Set /SP/cli timeout = disable
C. Set /SP/cli timeout = 0
D. Set /SP/cli timeout = 1000

Answer: D

Reference:https://docs.oracle.com/cd/E26698_01/html/E26434/ceicefgj.html

QUESTION 2
Which three are included for each test in the Enterprise Installation Standards (EIS) Test procedure Plan?

A. The test objective
B. The test method
C. The expected outcome of the test
D. Troubleshooting for each failed test

Answer: A,B,C
Explanation:

QUESTION 3
When setting up Oracle VM Server for SPARC on a SPARC 14 server, you did not remove unneeded PCIe devices from control (primary) domain. What is the impact?

A. PCIe devices from the control domain can no longer be used in I/O domain.
B. Removing PCIe devices from the control domain for use in I/O domains requires a delayed reconfiguration and a reboot of the control domain.
C. You can no longer migrate guest domains to another physical system by means of the domain migration Feature.
D. There is no impact, as PCIe devices can be dynamically reassigned from the control domain to an I/O domain.

Answer: A

Explanation:

QUESTION 4
In planning for the installation of a SPARC T4 server, you notice that a more recent version of a patch is available than what is currently on the EIS-DVD. According to the Enterprise Installation Standards (EIS) methodology, what should you do?

A. Always install the most recent version of a patch
B. Delay Installation until the updated patch is published to the EIS-DVD
C. Do not Install the patch, unless instructed to do so by an EIS-Alert
D. Never Install patches outside of the EIS-DVD

Answer: A
Explanation:

QUESTION 5
The SPARC T4-2 server has ___________ than the SPARC T4-1 server.

A. 512 GB more memory
B. 1 TB more memory
C. 64 more compute threads
D. 128 more compute threads

Answer: B
Explanation:

Click here to view complete Q&A of 1Z0-597 exam
Certkingdom Review
, Certkingdom PDF Torrents

MCTS Training, MCITP Trainnig

Best Oracle 1Z0-597 Certification, Oracle 1Z0-597 Training at certkingdom.com

 

Click to rate this post!
[Total: 0 Average: 0]